Spaceport America Construction Status
Friday, June 4, 2010
Spaceport construction workers on THF stair support tower (May 2010)
Newer Post
Older Post
Home
Followers
Blog Archive
►
2011
(55)
►
September
(2)
►
August
(5)
►
May
(10)
►
April
(4)
►
March
(10)
►
February
(17)
►
January
(7)
▼
2010
(131)
►
November
(25)
►
September
(17)
►
August
(12)
►
July
(26)
▼
June
(51)
THF Construction June 21, 2010
THF Apron concrete
ARFF dome shooting concrete or (Shotcrete)
Spaceport runway signage
Taxiway view of THF
THF construction June 21, 2010
THF Construction June 21, 2010
THF flooring and roof trusses starting to go in (J...
East side of the three story THF (June 2010)
Airfield Rescue, Fire Facility inside dome concret...
Airfield Rescue, Fire Facility inside dome concret...
Airfield fuel storage area (June 2010)
Airfield paving equipment (June 2010)
Airfield water storage tank (June 2010)
THF rebar reinforcement (May 2010)
THF steel roof trusses (May 2010)
THF retainment wall panels (May 2010)
Entrance to THF form and footing work (May 2010)
THF construction looking east (May 2010)
Main THF crane (June 2010)
Front of the THF looking down taxiway (May 2010)
Gravel hill at the onsite concrete plant (May 2010)
Cement trucks unloading at onsite concrete plant (...
ARFF dome (May 2010)
ARFF dome inflation system (May 2010)
ARFF dome footing (May 2010)
Spaceport construction workers on THF stair suppor...
Air, Rescue Fire Facility Dome with THF constructi...
South end of runway and turnaround (May 2010)
Spaceport construction of THF and taxiway (May 2010)
Spaceport construction of THF and apron (May 2010)
Spaceport construction of THF and apron (May 2010)
Crain lifting concrete forms for support towers to...
Support stair and elevator tower to the THF (April...
Runway rebar stapled to asphalt before concrete po...
Onsite asphalt (hot mix) plant (April 2010)
Concrete pour on runway (April 2010)
Spaceport America runway aerial shot (March 2010)
The runway soil cement base (required before the a...
14" concrete finish layer being applied on top the...
Asphalt production plant at the Spaceport America ...
Concrete production facility at the Spaceport Amer...
Heavy equipment used on the Spaceport America runway
THF footings (March 2010)
Terminal Hangar Facility (THF) crane work (March 2...
Waste water storage tank site construction
Waste water storage tank being put underground at ...
Newly constructed launch pads for NASA’s 2009 Nort...
New Mexico Governor Bill Richardson speaks at the ...
Side elevation rendering
After starting work in September 2008, the road im...
►
2009
(1)
►
November
(1)
About Me
Spaceport America Construction Status
View my complete profile